PAVING (REMOVAL & REPLACEMENT)


1. By means of excavating equipment, remove existing asphalt surfaces as laid out under Scope of Work.

2. Re-grade existing aggregates to conform to best drainage available per site conditions. Adjust basins/drains if required.

3. If aggregates are inadequate or soil conditions are not to code, report on findings to Owner or Owner's Representative for direction.

4. Care shall be taken not to disturb the area surrounding the excavation(s).

5. Upon completion of grading and compaction of aggregates, install 1½ inch HL8 base asphalt. After initial rolling and compaction of base, install one-half inch HL3 or HL3A finish asphalt.

NOTE: Finish grade at Owner's discretion ie HL 3 or HL 3A.

6. Any encumbrances in the surfaces shall be hand-compacted to surrounding planes, in the thicknesses outlined as above, ie: three inch thickness.

7. Where a full excavation of all asphalt is not being carried out, the seam between old and new asphalts will be sealed with a hot bitumen.

NOTE: Tack-coat shall be applied between layers, if required.