Home All Specifications Separate Coping Stone

SEPERATE COPING STONE


1. Carefully remove loose and displaced coping units.

2. Clean out the unit cavity of all loose material and wash with water to remove dust. Pre-wet the adjacent material.

3. Reset units on a solidly and evenly filled bed of mortar.

4. Heavy units are to be wedged tightly into position with wooden wedges, previously soaked in water.